Here are some of the items we have addressed recently:
But first some Sailing!
1. Removed a diesel/electric water heater. It was taking up too much room and interfering with the engine circulation.
2. Installed a big Rule automatic bilge pump.
3. Removed the shore electric and a variety of abandoned circuits.
4. Installed a battery cover for the 2 deep cycle batteries.
5. Replaced the deck flood light and mast light with LED bulbs.
6. Did the required glass work and reinstalled new/used stanchions to replace the 2 that were damaged in Florence. We also rewired all 4 lifelines.
No comments:
Post a Comment