Saturday, April 16, 2016

Hydro: Scuppers



This weekend we cut holes for the port and starboard scuppers and glassed it up.
Since this area will most likely be constantly wet, we took extra care in sealing up the holes.
After the holes were cut, we saturated the raw ply with epoxy.  The transom is made of (2) 3/4 ply wood epoxied together.
Next we cut thin wall PVC tube to line the holes.  The tube was abraided with sandpaper. The tubes had a slightly loose fit so we wrapped the tube with glass tape, saturated it and twisted it into place.
We left the tubes slightly long.  This allowed us to wrap the ends with carbon fiber tow and press it into the seam with a screw driver.
Today the lamination was hard so we sanded the tubes flush.  It looks like a solid connection. Over the season, we will monitor the integrity of this joint.
This is the sanded flush starboard scupper.
This is the glass tape and CF tow we used to wrap the scupper tubes.
This is the interior view of the port scupper.

Stern view showing the new scuppers.

Wednesday, March 30, 2016

Hydo: self draining cockpit/false bottom

Back to work on the hydro.
While it is looking like and ugly duckling, it is getting very close to launch day.
Today we took a big step forward by installing the false bottom.  There are 3.5 inch tall framing members set longitudinally supporting the hulls exterior.  By installing an elevated floor, we will be able to have a self-draining cockpit.  This is a huge quality of life improvement in boating.
We will be able to leave the hydro in a slip for periods of time and not worry about it.
To accomplish this, we cut limber holes on both port and starboard sides of each of the cross members.  These were glassed.
Because the boat will sit with stern down when at rest,  all the limber holes drain to the stern sections of each pontoon.  In the photos, you can see the 6 inch diameter deck ports we cut into the walls of the cockpit.  Any water that makes it into the interior of the hull will end up in the accessible area of the pontoons.
From midship forward, the pontoons are totally filled with 2 pound foam.
This open space in the rear of the pontoons will allow some storage but is mainly for inspection and off season drying of the hull.
The newly installed floor will keep any uninvited water out of the hull's interior.   Next we will mark the appropriate spot for scuppers. After these are cut and glassed, we will be ready for paint.
The surface is getting closer to fair.

Cross member with limber hole visible.
The false bottom is 1/2 osb glassed on all sides.  It is screwed to the cross members.  The glass tape is not so much structural but is primarily used to keep the water headed to the scuppers.
The floor is in.  After paint, the deck plates will be installed.

Saturday, March 26, 2016

Boating and Camping: Hammocks Beach

The beautiful spring weather got us in the mood to get outside and camp.  We looked up State Parks and found wonderful
Hammocks Beach State Park.
Here is the Google Sat view
It is a fantastic place.
It is a barrier island right next to Bogue inlet.  There are strong tidal currents to be aware of.  There is only primitive camping.  Three of the 14 camp sites are boat in only.
From google maps sat view, it looked like #14 would be accessible with our skiff, so we reserved it.
The island has many sea grass shallows behind it and the water is very thin.  Most folks arrive on the island either on the ferry that stops in the middle of the island or by paddle craft.  There is about 1 mile between the mainland Park center and the island.
The boat-in sites are spectacular.  This is the most scenic campsite I have ever seen.  We had 2 days of peace a quiet, other than the wind in the live oaks.
Totally worth a the trip.




There are lots of great shell to be found.



Wednesday, February 24, 2016

Gale

It is a great day to be tied up to a dock or inside reading.
There is a gale going on.
(The U.S. National Weather Service defines a gale as 34–47 knots (63–87 km/h, 17.5–24.2 m/s or 39–54 miles/hour) of sustained surface winds.)
They were above 40 and gusting higher.
Here is a link to the Town Dock wind gauge:

Visiting boats at the town dock





Tuesday, February 23, 2016

Marine Consignment

I was unhappy with the block type I had on hand for the turn in the cable near the stern.  It was the type that feeds through a wall.  It would be good for running a line under a deck.  We want the cable exposed inside the cockpit.  So, I stopped at Marine Consignment in town and found two perfect Schaefer blocks.  They will work well.
Marine Consignment is always fun to poke around in.  It is somewhat chaotic but there are aisles of great boat parts and great books.


Marine Consignment
Broad Street,  Oriental, NC.




Saturday, February 6, 2016

Hydro: Steering

We are anxious to keep the hydro moving forward. So even though it is too wet and cold for the needed glass work, it was a good day for a run to West Marine to pick up some needed parts.

For the steering we picked up 20 feet of 3/32nds stainless steel wire.  Some assorted swage fittings.
We also got some paint and 2 6inch deck hatches.  These will allow us access to the back of the pontoons.  Good for a little storage, but mainly to keep the interior of the hull ventilated and inspectable.

Here is the thin wire we will use for steering control.

In the bag

We are using a 4x9 inch piece of Starboard for the steering support.  We drilled a snug hole that supports the shaft and acts as a bearing.
The battens we used to form the cockpit fairing will eventually be glassed over.
At some point, we will flip the hull over and do this work then.  We will also address any needed fairing on the underside of the hull and paint the bottom.

Because the shaft and the drum are steel and we are in a salty environment, we sanded the part and coated it in epoxy.

Monday, January 25, 2016

House building: raising the walls

The Hydro is waiting on more epoxy and warmer weather.  We have been building our house.
Here is a clip of a wall raising and some images of the project...











House Elevation: Allison Ramsey Architects

Sunday, January 10, 2016

Hydro: Junk yard Steering

We are trying to keep the cost of the hydro in check so we are fabricating the steering system out of found parts.  (Found in our garage)
To date we have spent about $400 out of pocket on the boat.
Of this, $330 was on glass and epoxy
The balance was on the steering wheel, seat and deck parts at Oriental Consignment.
We are using a cable system to turn the motor.
It is comprised of the wheel, a shaft. a bearing plate, a cable drum and 4 blocks to lead the cable back to the port and starboard sides of the motor.
The shaft is a 5/16ths steel tube we had.  The bearing plate is a front spring strut cap out of my son's 1984 Porsche 944!  He replaced the front struts with Bielsteins and he is happy about that, willing to let the old parts go.
The cable drum is a 4 inch hole saw bit.  This was welded onto the shaft at the appropriate position.
Not only will this provide pulling force on the motor, it also provides a useful backing plate to bolt the steering wheel to.
Today we screwed the bearing plate to the front bulkhead. We added a bit of Starboard behind it to prevent wear through.  We also added a cross strut of mahogany 1x3 that will support the wheel end of the assembly...
The Porsche strut cap is our shaft bearing on the front side.

Here is the hole saw which will allow us to roll stainless steel cable in 2 directions to  both  sides of the motor.

The shaft is about 2 feet long.

Here is the mahogany strut to support the front of the assembly.

A front bearing is still needed.  It could be as simple as a piece of wood with a  snug hole in it.

Good Hydro water!!

Sunday, December 27, 2015

Hydro: Surface Prep

We got the hydroplane outside so we could begin surface preparation.
There will be a great deal of sanding and the weather is nice.  It's good to get out of the shop.
Today we trimmed off the excess glass cloth, sanded the entire exterior and vacuumed the boat off.
The sanding was done with 80 grit.  This is a good aggressive grit to prep for the needed surface fairing.
Here are photos of the current state of the hull:





Friday, December 25, 2015

Hydro: skinning the deck

The last couple of days we have added two layers of 9 oz glass twill set in epoxy.
Prior to this step we had spent several hours adding fairing material to the rough shaped foam.
Additional fairing will be needed after the cloth work is finished but these coats will be much thinner.
To get to this point we were adding serious amounts of fairing material to match the shapes of the pontoons.
In past projects I used Aerosil.  This is the brand name of a colloidal silica product.  I purchased a large volume of it and used it for fairing, structural bonding and fillets.  It is not best suited for fairing because it is harder than proper sanding additives.
Because this project was going to require a large amount of fairing, we ordered a big quantity of phenolic micro balloons from Raka Supply in Florida.
I love this stuff.  Colloidal silica is super light and gets airborne very easily. A respirator is mandatory and the stuff feels weird if you get it on you.  It is also hard to mix into epoxy.
The micro balloons almost absorbs the epoxy like a sponge.  It also doesn't go airborne, but is also feels weird.
Here are some photos of these steps...



phenolic micro balloons





Sunday, December 13, 2015

Cooler water temps and good fishing

Today our sons had a good outing in the skiff.
The summer fishing was poor but with the cooler water temps, we have seen the locals out.
In a short time the boys pulled in a Red Drum and a Speckled Trout.



Saturday, November 21, 2015

Hydro: Reworking the pontoons

We spent some time trying to get the pontoons to have an identical shape.  It was a bit tough as we are are sculpting them individually.  To solve the problem, we used a batten.
The batten provided us a fixed reference point off of which we had something to measure and sand the pontoon shapes with a good degree of uniformity.
In the photos below you can see how the batten is used and the steps involved in the process...

This is the port pontoon.  The batten is visible. We cut a slot in the foam from the bow back about 5 feet.  The batten is set in the slot and epoxied in place.  On the starboard side and identical batten is used stretching from the same two exact points.
On top of the 2 part foam we added spray foam to build up the shape we wanted.



We then disk sanded down to the batten and from this edge we were able to form the correct shape.
Phenolic modified epoxy is then used to smooth out the rough sanded shape.
After the whole pontoon is coated with this material, an orbital sander will be used.
After the sanding we will then glass the surface and overlap the hull bottom to seal up the pontoon.
To slowly remove the foam, we are using a variable speed sander set at the slowest rpm.  This allows more control.