Showing posts with label gel coat. Show all posts
Showing posts with label gel coat. Show all posts

Saturday, February 15, 2014

Sup Plug: Step #7

Sanding, fairing, sanding then another layer of gelcoat:
It would be hard to do these steps too many times.


Thursday, November 21, 2013

Sup Plug: Step #6

Gel-coat overcoat.
After extensive sanding of the first layer of gel-coat, the plug is ready for the next layer.
With each layer, the number of issues (divots, surface blemishes etc.) are fewer.
It the following photos you can see areas that we added fairing on top of the first layer of gel-coat.
Once today's coat is added, the problems will be down to a handful.
I expect we will have one more pass.

Today's coat is a grey to contrast with the blue under-layer.





Sunday, October 21, 2012

Non-traditional plug fabrication

Having never learned surfboard shaping with a foam blank and a Skill 100 planer, I approached our paddle board plugs more like a small thin boat hull.
This means math and lofting.
On paper we decided on the overall characteristics for the board, next we decided on where the split would be in the form.  Then we start with the bottom half of the hull and build it up from a strong back.  Unlike a our past boats though, the strong back is a plywood plane.  (our second board has the rocker built in to the strong back (see below).
With thin ply, foam and fairing we shape the rails, rocker and concave.  This method allows us to easily keep the board symmetrical.  It also provides a great surface for the mold's flange.

After passes with gel coat, fairing and addition gel coat, the plug / form can get as smooth and fair as you like.




Tuesday, October 9, 2012

Deck Molds for the SUP

The hull, nose and tail of the Sea State SUP will be made of gel coated fiberglass.  The remainder of the deck will be wood strip construction.
The deck molds popped off of the plugs with little effort!
They have a smooth finish and only require a little finish work on one edge of the bow deck mold.
We got a call from our material supplier.  Our new barrel of resin is in.  495 pounds of liquid parts.
The first kits will be ready in a week.