Tuesday, July 17, 2018

Sabre 28 Projects: Chain Locker

The chain locker on the Sabre has a drain.  It is a small hole right through the stem about a foot above the waterline.  The hole is about 3/8ths of and inch and was clogged for several years apparently.  Rain water filled the locker and eventually rotted the bulkhead.  It was holding water when I got it.  The first project was to cut out the bulkhead and replace it with marine ply.
Because the deck is inplace, the bulkhead had to be installed with a seam.  This was backed up with an overlapping butt joint and the locker side was glassed with layers of glass cloth set in epoxy.
The drain hole is clear and one of the regular maintenance items will be to check it.  Washing down the rode will be a priority.
The locker after repair and paint.

The bulkhead. The treated pine 5 quarter  thick strips are epoxied in and will provide a surface to fasten finish oak lapping to match the existing woodwork.

No comments: